Skip to content
167-169 Great Portland Street, 5th Floor, London W1W 5PF, UK
Services

Office fit-out in the UK

Stay put and rebuild the rooms. We run the internal building works, meeting and demonstration rooms, then bring in data, Wi-Fi and electrical from the dedicated Constructive-IT teams.

  • Internal walls and room layouts on a stay-and-refit
  • Meeting and demonstration rooms built to the brief
  • Data, Wi-Fi and electrical through the dedicated pages
  • One Constructive quote — no cart

Rooms first, then the kit

Office fit-out here means the building and the rooms: partitions, meeting space, demonstration space, and the path for power and data. Furniture lives on the refurbishment pages. Cabling, Wi-Fi and electrical keep their own pages — this hub sequences them onto one programme.

Every path ends at a quote. We do not sell rooms from a cart.

Get a quote
Office fit-out floor plan showing offices, lobby, demonstration area, kitchenette and services

What we build

Three building packages on this page. Power, data and Wi-Fi are linked below, not copied here.

Structural and internal changes

We plan and run the internal building works that change how the floor is used: partitions, door sets, ceiling and floor finishes where the brief needs them. The furniture and the cable wait until the rooms exist.

Meeting rooms

We build the room, then the power, data and display path so a meeting starts without a trailing loom. Screens, tables and chairs can follow from the furniture refurbishment page.

Demonstration rooms

Demo and show-space rooms need sightlines, power density and a clean data path. We set the room first, then bring in the network and electrical teams on the same programme.

How a fit-out runs

01

Survey

We walk the floor, mark what stays, and list the rooms, power and data the brief actually needs.

02

Specify

Building works first, then furniture, cabling, Wi-Fi and electrical as named packages on one programme.

03

Quote

One Constructive quote. Dedicated pages hold the detail for data, Wi-Fi and electrical.

04

Build

Rooms and structure go in before desks. We keep access for the cable and power install.

05

Connect

Cabling, Wi-Fi and electrical land on the finished floorplate. Furniture can follow the same week.

Planning a stay-and-rebuild?

Send the floorplate, the rooms you want and whether power and data are in or out of the brief. We will come back with a programme and a quote.

Get a quote
Join Constructive-IT For Updates, Specials, and News
Stay informed with our latest IT infrastructure insights